davor@ogresta.eu +34 65 9019 049

Puente San Sebastian

Project information

Installation of two 150 t bridge sections across Urumea river, San Sebastian, using mobile cranes, winches and strand jacks for lifting. Dimensions of each section are:

Length (60 m), width (7m) and height (3m).

Scope of work: flotation and positioning of section for lifting (Lastra, Madrid)